Well, the morning started out great. The deck railing was installed down to where we are waiting on additional materials. Everything went smoothly.
Should have known things were going too smoothly. After lunch, spent 2 hours trying to get the top section of stair railing configured properly. A critical piece of info was not included in the instructions. Once we figured that missing piece, the second top section was simple to do.
Once I can do some illustrations, Ill write up what was missing. It is really looking good, and worth the expense.
Next we learned the we didnt get the correct length material to finish the decking, but tomorrow will most likely be dedicated to finishing the stair railings, and possibly starting the lattice for the lower side. I guess it will be next week before this phase is finished. Then will just need to get some walks poured.