metal shop update

Written By shiva on Tuesday, February 11, 2014 | 3:45 AM

Wood Plans Woodworking Carpentry Download
the sheetrocks taped and painted.  the doors are (finally) hung so that they open all the way .. that was dans job and it took him until today to get it all figured out ... waiting now only for the concrete slab for the storage shed for the steel and the rest of the siding, which should be installed next week 
or the week after .. getting close now ... more metal shop photos here.
 they open all the way ...
 
 they close all the way and the transom glass is in now ... time for interior trim ..
and its high foliage fall in vermont, and the weather for the last two weeks has been superb.

 